Reference Redesign of the exhaust air system of a production area at Novelis Sheet Ingot GmbH
Rescheduling of the exhaust air system of a production area at Novelis Sheet Ingot GmbH
Overview
Location: Nachterstedt plant, Saxony-Anhalt, Germany
Project duration: 12 months
Focus: Inventory, 3D scan, piping redesign, system planning, project management
HÖRMANN Rawema Engineering & Consulting GmbH implemented the redesign of the exhaust air system of a production area at the Nachterstedt plant with the aim of measurably improving flow behavior, safety functions and reliability and ensuring implementation through to final acceptance.
Project content
Exhaust air system analysis and improvements
Analysis of the existing exhaust air system and derivation of targeted improvements in terms of flow behavior, safety functions and reliability. Reliable basis for replanning and implementation.
3D laser scan of existing ducts
Inventory of the ductwork using 3D laser scanning. Precise recording of geometries and interfaces as a basis for planning and collision checks.
CFD flow calculation
Calculation of flow resistances using computational fluid dynamics (CFD). Evaluation of pressure losses and power reserves for designing the new pipe routing.
3D pipeline redesign
Redesign of the pipeline routing in 3D. Optimized routes, cross-sections and installations to improve throughput and operational reliability.
Specification of measures and supplier selection
Specification of the conversion measures with clear descriptions of services and interfaces. Structured supplier selection and support through to commissioning.
On-site planning and monitoring
Planning and monitoring of the conversion measures on site. Schedule, quality and interface coordination through to functional approval.
Final acceptance and documentation
Execution of the final acceptance with proof of performance. Complete documentation as a basis for operation, maintenance and subsequent adjustments.
Advantages of our solution
- Flow efficiency: CFD-supported design reduces flow resistance and stabilizes exhaust air performance.
- Operational safety: Improved safety functions and quality-assured implementation increase reliability and availability.
- Transparency: 3D scanning and 3D replanning make pipe routing, installations and interfaces clearly comprehensible.
- On-time implementation: Precise specification of measures, supplier management and on-site monitoring reduce risks and rework.
- Documentation clarity: Final acceptance and complete documentation provide evidence and auditability for operation.
Contact us
Interested in a customized factory planning solution for your company?
Contact our experienced team at HÖRMANN Rawema for a no-obligation consultation. >>