Variant comparison of neutralization systems at Novelis Deutschland GmbH - Nachterstedt plant

Overview

Location: Nachterstedt, Germany
Project duration: Q4/2023 - Q2/2024
Investment sum: over €2.5 million. €

HÖRMANN Rawema Engineering & Consulting GmbH successfully carried out a comparison of variants for neutralization systems at the Nachterstedt plant. The aim was to identify the best technical and economic solution, clarify interfaces at an early stage and create a reliable basis for investment decisions.

 

Project content

Data collection

Systematic collection of relevant plant data, boundary conditions and requirements. Consolidation of the information as a basis for the assessment.

Determination of basic principles

Determination of technical and regulatory principles for neutralization systems. Definition of design parameters and interfaces to the technical infrastructure.

Supplier research and enquiries

Identification of suitable suppliers and preparation of clear inquiry documents. Comparison of offers according to scope of services, quality and deadlines.

Layout planning

Development of a site-specific layout with installation areas, media connections and logistical routes. Consideration of structural requirements and interfaces to production and operations.

Variant comparison

Evaluation of several solution variants based on a catalog of criteria. Comparison of technical performance, cost-effectiveness, risks and scalability.

Budget calculation

Reliable cost estimate for investment and operation. Transparent comparison with the investment framework of over €2.5 million.

Scheduling

Creation of a realistic schedule with milestones for procurement, installation and commissioning. The basis for plannable implementation.


Advantages of our solution

  • Founded basis for decision-making: Structured comparison of variants creates transparency and reduces wrong decisions.
  • Cost certainty: Reliable budget calculation and investment comparison increase planning certainty.
  • Date and implementation planning: Clear milestones accelerate implementation and ensure the start date.
  • Interface clarity: Integrated layout and infrastructure planning minimizes risks in production, logistics and construction.
  • Supplier management: Targeted research and inquiries strengthen quality and cost competition.
     

Contact us

Interested in a customized factory planning solution for your company?
Contact our experienced team at HÖRMANN Rawema for a no-obligation consultation. >>

hoermann-rawema-refernz-Novelis-Deutschland-GmbH-Werk-Nachterstedt-1
hoermann-rawema-refernz-Novelis-Deutschland-GmbH-Werk-Nachterstedt-2