Reference conversion/structuring maintenance and renovation of an existing hall at Bharat Forge Aluminiumtechnik GmbH
Conversion/restructuring maintenance and refurbishment of an existing hall
Overview
Location: Germany, Saxony, Brand-Erbisdorf
Investment amount: approx. 500.000 €
Project duration: 10 months
HÖRMANN Rawema Engineering & Consulting GmbH took on the comprehensive general planning for the restructuring and refurbishment of an existing hall at Bharat Forge Aluminiumtechnik GmbH. The project included both the new technical planning of the maintenance processes and the structural refurbishment of the existing hall structure.
Project content
Creation of a machine list including determination of required connections and their power
Detailed recording of all machines and systems with precise determination of the required energy connections and power requirements for optimal integration into the new hall structure.
Creation of a facility layout in 2D and 3D in visTABLE
Development of a consistent factory planning concept with modern 3D visualization tools for optimal use of space and efficient workflows in maintenance.
Planning and evaluation of the structural implementation and technical building equipment, preparation of the necessary drawings
Comprehensive technical building equipment planning with detailed evaluation of the structural measures and preparation of all necessary implementation drawings.
Evaluation of existing connections and existing buildings
Structural analysis of the existing building fabric and evaluation of the integration possibilities of existing connections and infrastructures.
Production of cost estimates and schedules
Development of realistic cost calculations and detailed project schedules for on-time and on-budget implementation.
Execution of service phases 1 - 8 for construction and technical building services
Complete project management from basic evaluation to project management in accordance with HOAI for both construction and technical building services.
Interface coordination between the planning participants
Professional coordination of all specialist planners and trades involved to ensure smooth project execution.
Conducting construction meetings
Regular coordination and agreement with all project participants through structured construction meetings during the entire implementation phase.
Advantages of our solution
- Comprehensive general planning: Complete project management from a single source from the initial idea to completion
- Modern 3D planning tools: Use of visTABLE for precise visualization and optimal use of space
- Inventory optimization: Professional integration of existing structures to minimize costs
- On-time implementation: Structured project management with detailed scheduling and cost planning
Contact us
Interested in a customized factory planning solution for your company?
Contact our experienced team at HÖRMANN Rawema for a no-obligation consultation. >>